Chemical Plants
Hte has worked on over 50 projects of distillation plants and general chemical plants during his more than 24 years of activity.
HTE is able to provide both basic and detailed engineering as well as the supply of turnkey plants. There are numerous installations all over the world in the field of organic solvent recovery or for the flexible food packaging market.
In 2018-2019 HTE built Green filed Turn key in Hungary the DMF recovery plant used in the carbon fiber production process, one of the largest in the world (35 tons of production hours). Today HTE is working on the construction of a solvent recovery plant for the production of lithium batteries for NorthVolt in Sweden, as part of one of the GIGafactories under construction in Europe.
Since 2020, in collaboration with Korec, Hte has been working on the first industrial pilot plant for the recycling of fiberglass and carbon fiber, a worldwide patented process that allows the concepts of the circular economy to be extended to composite fibers as well.
DMF recovery
Green field turn key 33 ton/h dmf recovery plant.
design – procurement – construction.
Engineering – Heat exchangers and distillation columnms
3 effect broth concentration plant
Glass Fiber full recovery plant - Korec process
Plant for full recovery of Fiberglass scraps.
The Korec process permit to recover glass and resins from scraps.